During the past year we have been working with Lymm Methodist Church; to analyse the use and condition of the Church buildings and work up a set of strategy options for the short and long term future of the complex of buildings on the site.
Proposals
A range of proposals were put together for consultation. These include renovation options to improve access and better cater for the needs of the many local groups which use the site alongside the congregation. Of these, a few outline proposals have been worked into a sketch model; to give a more tangible sense of what may be possible within the site constraints.